电气技术  2013, Vol. 14 Issue (01): 84-84    DOI:
技术与应用 |
110kV新野变两台主变并列运行可行性分析
赵颖博
新野县电业局, 河南 新野 473500
110kV Xinye Substation Two Main Transformer of Run in Parallel with Feasibility Analysis
Zhao Yingbo
Xinye Electricity bureau, Xinye, Henan 473500