Abstract:Describe the anomalies and processing about "110 kV protection measurement and control device for remote communication chaos" in the process of the main transformer shock appear, Through in-depth reading of related control circuit from the main transformer on-load voltage regulating, analysis the cause of the exception occurs,Preventive measures are put forward to avoid the repeated abnormal .
宿波,陈刚,虞嵘. 由主变调压闭锁回路引发的全所交、直流混串的分析和控制[J]. 电气技术, 2014, 15(01): 62-64.
Su Bo, Chen Gang, Yu Rong. Analysis and Control of AC and DC Series about Substation Caused by Voltage Regulation Blocking Circuits about Main Transformer. Electrical Engineering, 2014, 15(01): 62-64.