The Study on FCB Test of a 660MW Domestic Supercritical Unit
Gao Xianpeng1, Zou Baochan2, Liu Xinlong2
1. Datang Binchang Power Generation Co., Ltd, Shaanxi Xianyang 713602; 2. North China Electric Power Research Institute(Xi'an) Co., Ltd, Xi'an 710065; 3. Northwest Electric Power Design Institute, Xi’an 710065
Abstract:In this paper, the control of the thermal power unit to realize the FCB function difficulty were analyzed, and on the base of this, the FCB control logic was improved and optimized. Test listed in this paper, logic design and the optimization improvement is effective. Finally, testing process parameters were provided by authors as reference for the same type unit.
高先鹏, 邹包产, 刘新龙. 国产660MW超临界发电机组FCB试验研究[J]. 电气技术, 2014, 15(09): 48-52.
Gao Xianpeng, Zou Baochan, Liu Xinlong. The Study on FCB Test of a 660MW Domestic Supercritical Unit. Electrical Engineering, 2014, 15(09): 48-52.