Abstract:This article through 110kV Xin-ye substation two main transformer of run in parallel with feasibility analysis. And testified run parallel with two transformers is feasible. And according to the actual operation of transformer when run in parallel with the circulations is analyzed, and prove the above two transformer is tied for the operation reliability and connecting with the reality of transformer transformation problems of suggestions.
赵颖博. 110kV新野变两台主变并列运行可行性分析[J]. 电气技术, 2013, 14(01): 84-84.
Zhao Yingbo. 110kV Xinye Substation Two Main Transformer of Run in Parallel with Feasibility Analysis. Electrical Engineering, 2013, 14(01): 84-84.