The Process and Implement of 500kV Transmission Line Suspensionin Sulator String Charged Water Flush
Niu Huiwen,Zhang Haifeng,Wu Baogui,Fang Kangjian
1. State Grid Zhejiang Electric Power Corporation Training Centre, Hangzhou 311600; 2. Shanxi Jinyuan Power Electronic Chemical Cntre Co., Ltd, Taiyuan 030000
Abstract:Po11ution flashover of insulators is one of the key factors which causes trip fault of electrified line, charged water washing can solve the po11ution flashover of insulators effectively.The 220kV transmission line has already concluded a set of method of effective water washing.However, the 500kV transmission line charged water flush is a blank.This paper instructs the specific process and the operation practice of the 500kV transmission line suspensionin sulator string charged water flush, which can provide a reference for the launch of the 500kV charged water transmission line flush in future.
牛慧文,张海峰,吴宝贵,方康健. 500kV输电线路悬垂绝缘子串带电水冲洗的工艺和实施[J]. 电气技术, 2015, 16(05): 121-123.
Niu Huiwen,Zhang Haifeng,Wu Baogui,Fang Kangjian. The Process and Implement of 500kV Transmission Line Suspensionin Sulator String Charged Water Flush. Electrical Engineering, 2015, 16(05): 121-123.