Abstract:The 3 power station generator installed 7.5MW(2*3+1*1.5MW), the generator outlet voltage 10.5kV. Generator voltage side connection USES the expanding unit + variable group of connection mode, the expanded unit connection Settings for 10kV wiring 1 straight back and sent to the nearby10kV power supply area. Main transformer high voltage side adopts single bus bar connection mode, power station to send the 35kV voltage grade, 35kV line line 1 loop back to the western suburbs, and NongQiShi grid connection.
袁秀. 奎屯河2#水电站电气主接线及主要设备的选择[J]. 电气技术, 2013, 14(12): 102-104.
Yuan Xiu. Kuitun river 2# Hydropower Station, the Main Electrical Wiring and the Selection of Main Equipment. Electrical Engineering, 2013, 14(12): 102-104.