|
1
|
The Research on the Model and Simulation to the Transient Signal in the Trans-Mission Line
|
2014 Vol.15(05):39-43
|
|
Yang Chaobing, Fu Xuewen, Wei Zhijuan |
[Abstract]
(336)
[HTML 0 KB][PDF 0 KB]
(3804)
|
|
|
|
|
2
|
Research on the selection of copper busbar in low voltage switchgear
|
2018 Vol.19(11):82-87
|
|
Xu Deqin, Sheng Xiaoyan |
[Abstract]
(173)
[HTML 0 KB][PDF 2735 KB]
(2721)
|
|
|
|
|
3
|
The Two-Axis Servo Control System based on S7-200 SMART PLC
|
2016 Vol.17(5):85-90
|
|
Wang Hao, Wang Qin |
[Abstract]
(445)
[HTML 0 KB][PDF 1121 KB]
(4181)
|
|
|
|
|
4
|
Short term power load forecasting based on temporal convolutional network-long short term memory and improved attention mechanism
|
2024 Vol.25(10):8-14
|
|
LIU Wei, WANG Hongzhi |
[Abstract]
(174)
[HTML 0 KB][PDF 1851 KB]
(1587)
|
|
|
|
|
5
|
Optimization of charging strategy for electric heavy truck charging and swapping stations based on genetic algorithm
|
2025 Vol.26(3):36-41
|
|
WANG Bo, YANG Ke’nan, YANG Yingchun, WANG Shaopeng, HAN Jinfeng |
[Abstract]
(640)
[HTML 0 KB][PDF 1409 KB]
(1264)
|
|
|
|
|
6
|
Cause analysis and preventive measures of an abnormal tripping of 110kV transformer protection device
|
2022 Vol.23(4):92-95
|
|
LIU Yaoyun |
[Abstract]
(274)
[HTML 0 KB][PDF 2215 KB]
(1712)
|
|
|
|
|
7
|
Review on intelligence fault diagnosis in power electronic converters
|
2019 Vol.20(3):6-12
|
|
Chen Shican, Lin Qiongbin, Chen Sixiong, Cai Fenghuang, Wang Wu |
[Abstract]
(371)
[HTML 0 KB][PDF 1261 KB]
(2286)
|
|
|
|
|
8
|
Analysis of Elevator Control System Design based on PLC
|
2016 Vol.17(11):125-132
|
|
Huang Lijing |
[Abstract]
(380)
[HTML 0 KB][PDF 749 KB]
(2984)
|
|
|
|
|
9
|
Review of research on parameter identification of permanent magnet synchronous motor
|
2020 Vol.21(8):1-5
|
|
Liu Wei, Wang Jun |
[Abstract]
(225)
[HTML 0 KB][PDF 2478 KB]
(2894)
|
|
|
|
|
10
|
Principle and control of new type large capacity synchronous compensator
|
2021 Vol.22(6):87-91
|
|
SU Dongliang, DENG Huayun |
[Abstract]
(223)
[HTML 0 KB][PDF 765 KB]
(2151)
|
|
|
|
|
11
|
The High Voltage Cable Fault and its Condition Detection Technique
|
2014 Vol.15(09):70-73
|
|
Wang Chuanxu |
[Abstract]
(290)
[HTML 0 KB][PDF 304 KB]
(3822)
|
|
|
|
|
12
|
Survey of the Methods to Select Fault Line in Neutral Point Ineffectively Grounded Power System
|
2015 Vol.16(12):1-5
|
|
Jiang Jian, Bao Guanghai |
[Abstract]
(296)
[HTML 0 KB][PDF 1179 KB]
(2544)
|
|
|
|
|
13
|
Impact of secondary AC circuit anomaly on line protection and optimum measures
|
2022 Vol.23(9):86-92
|
|
ZHAO Zhihong, WU Yekai, ZHANG Yuepin, DU Zhaoqiang, XIONG Jun |
[Abstract]
(253)
[HTML 0 KB][PDF 968 KB]
(2011)
|
|
|
|
|
14
|
Example Analysis of Reformation of Duplex Bus Protection in 220kV Transformer Substation
|
2014 Vol.15(12):81-84
|
|
Qian Bifu, Chen Gang, Lin Gaoxiang, Ye Zhengce, Wang Ce |
[Abstract]
(271)
[HTML 0 KB][PDF 944 KB]
(3195)
|
|
|
|
|
15
|
Application analysis of residual current operated protective devices in grounding system
|
2023 Vol.24(3):58-63
|
|
WEI Bo, DENG Yishuang, PU Chaohong, WANG Lingfeng, WEN Xiaochuan |
[Abstract]
(256)
[HTML 0 KB][PDF 838 KB]
(1977)
|
|
|
|
|
16
|
Design of partial discharge detection sensor for power cable based on COMSOL simulation
|
2023 Vol.24(4):29-36
|
|
ZHANG Zequan, CAI Xinjing |
[Abstract]
(373)
[HTML 0 KB][PDF 4170 KB]
(2404)
|
|
|
|
|
17
|
A review of gas discharge simulation based on finite element method
|
2022 Vol.23(7):18-25
|
|
CHE Rui, SUN Ming |
[Abstract]
(411)
[HTML 0 KB][PDF 2568 KB]
(2444)
|
|
|
|
|
18
|
Examination design and course quality evaluation of “project-based learning” process based on front-door adjustment
|
2022 Vol.23(10):74-79
|
|
QIAN Chen, KUANG Yi, ZHANG Jing |
[Abstract]
(230)
[HTML 0 KB][PDF 704 KB]
(1487)
|
|
|
|
|
19
|
Prediction of remaining useful life of transformer in distribution network
|
2024 Vol.25(3):32-37
|
|
LI Dong, QIAN Feixiang, LI Jinsong, DENG Qingfei |
[Abstract]
(198)
[HTML 0 KB][PDF 1190 KB]
(1878)
|
|
|
|
|
20
|
Design and development of wind farm main equipment early warning diagnosis system
|
2023 Vol.24(5):52-57
|
|
ZHANG Junjun, CHEN Guo, LU Yingqiang, QIAO Supeng, HU Zhongzhong |
[Abstract]
(895)
[HTML 0 KB][PDF 1878 KB]
(1979)
|
|
|
|
|
21
|
Research on energy storage site selection based on power grid vulnerability assessment
|
2025 Vol.26(3):7-14
|
|
SUN Shunxiang, LI Jinke, ZHEN Hongning, YANG Yun, HAN Zhikun |
[Abstract]
(507)
[HTML 0 KB][PDF 1150 KB]
(586)
|
|
|
|
|
22
|
Research and application analysis of 3/2 isolating switch (double break) bus ring wiring
|
2021 Vol.22(12):94-98
|
|
HONG Zhipeng |
[Abstract]
(111)
[HTML 0 KB][PDF 732 KB]
(1520)
|
|
|
|
|
23
|
Development of ±800kV Gas-insulated DC Wall Bushing
|
2017 Vol.18(12):42-45
|
|
Liu Pengfei, Nan Zhenle, Li Zhenjun |
[Abstract]
(199)
[HTML 0 KB][PDF 356 KB]
(1679)
|
|
|
|
|
24
|
Heavy gas protection fault analysis and prevention of 220kV transformer
|
2018 Vol.19(1):94-96
|
|
Chen Xiaoyun, Zhang Weiguang |
[Abstract]
(181)
[HTML 0 KB][PDF 325 KB]
(1934)
|
|
|
|
|
25
|
Analysis and countermeasures of closing process of 10kV no-load long cable line
|
2022 Vol.23(4):87-91
|
|
ZHANG Jian |
[Abstract]
(183)
[HTML 0 KB][PDF 786 KB]
(1190)
|
|
|
|
|
26
|
The Review of High Impedance Fault Detecting Technology of Distribution Network
|
2017 Vol.18(12):1-7
|
|
Zhan Qifan, Li Tianyou, Cai Jinding |
[Abstract]
(397)
[HTML 0 KB][PDF 274 KB]
(2485)
|
|
|
|
|
27
|
Typical cases analysis of 10kV cable fault location
|
2022 Vol.23(2):88-93
|
|
TAO Yuhang, ZHANG Xi, GONG Xianglong |
[Abstract]
(635)
[HTML 0 KB][PDF 5931 KB]
(1541)
|
|
|
|
|
28
|
Wind power prediction based on hybrid integrated model of random forest-convolutional neural network
|
2025 Vol.26(5):27-33
|
|
LI Huan, TENG Yunlei |
[Abstract]
(79)
[HTML 0 KB][PDF 2631 KB]
(909)
|
|
|
|